Front #79

ABTH 100.10.2

If a train has been off air less than 24 hours and the yard test plant pressure setting is less than the locomotive regulating valve, what is required? (Select all that apply.)


  1. A Brake Pipe Leakage Test
  2. An Initial Terminal and Road Air Brake Test
  3. An Intermediate Air Brake Test
  4. An Application and Release Air Brake Test
Back #79
Flag

ABTH 100.10.2


Answer: - A Brake Pipe Leakage Test - An Application and Release Air Brake Test
Feedback:
If a train is off air 24 hours or less and the yard test plant pressure setting is less than the locomotive regulating valve, you must: - Charge the air to the regulating valve setting - Perform a Brake Pipe Leakage Test - Perform an Application and Release Air Brake Test (Class 3 Air Brake Test)