Any question, rule number, or answer reported as wrong will get looked at manually in a couple of days. Please write what is wrong with this flash card and what it should be which will speed up the correction process. -Thank you!
Front #65
ABTH 105.1
An engineer is in the process of linking the lead locomotive to the remote locomotives. This train has two DP remote consists. DP remote consist B is in the middle of the train. DP remote consist C is at the rear end of the train. When the engineer goes to link them, which remote consist will the engineer link to first?
It doesn’t matter which DP remote consist the engineer links to first.
Engineer must link to a locomotive in DP remote consist B first.
Engineer must link to a locomotive in DP remote consist C first.
Answer: Engineer must link to a locomotive in DP remote consist B first.Feedback:
The order locomotives are linked is reflected on the DP control screen. An improper sequence could result in bad train handling and damage to equipment.