Front #62

ABTH 105.1

Place in order the steps to condition locomotives for distributed power (DP).


  1. Perform a brake pipe continuity test
  2. Set up the lead unit
  3. Link the remote(s) from the lead unit
  4. Set up the remote units
Back #62
Flag

ABTH 105.1


Answer: 1. Set up the remote units 2. Set up the lead unit 3. Link the remote(s) from the lead unit 4. Perform a brake pipe continuity test
Feedback:
When conditioning locomotives for DP, start with the remote unit(s). Condition only one locomotive per remote consist. Once this is complete, set up the lead locomotive, and then link the consists.